During the 2020/2021 off season much of the Shaman's track was replaced; the station, lift and first drop remained unaltered. The profile of some areas changed, but the overall layout has not changed. This was done in a similar way as was done in 2018 for Python at Efteling. The new track for Shaman however was not produced by CSM.
|
The Magic Mountain's original Arrow train chassis were replaced with new chassis from Vekoma in 2008 and for the 2009 season, the bodies were replaced. |
VR glasses were optional for the 2017 season. |