| Length | 3116.8 ft |
|---|---|
| Drop | 105 ft |
| Speed | 57.8 mph |
| Inversions | 0 |
| Vertical Angle | 57.3° |
| Duration | 2:00 |
| Airtime Points | 12 |
| Elements | Chain Lift Hill Tunnel |
| Arrangement | 2 trains with 12 cars per train. Riders are arranged 2 across in a single row for a total of 24 riders per train. |
|---|---|
| Built by | Gravitykraft Corporation |
| Designer | |
|---|---|
| Installer | Martin & Vleminckx |
| For the 2015 season, the original Vekoma trains with a 4x2x3 arrangement were replaced by Timberliner trains from Gravitykraft. |