Statistics

Height:60.7 ft
Inversions:0
Speed:40.4 mph
Duration:1:10
Elements:Tunnel

Details

Designer:Ing.-Büro Stengel GmbH
Subcontractor:Giovanola
Trains:7 cars per train. Riders are arranged 2 across in 2 rows for a total of 28 riders per train.
Facts:A tunnel on the first drop was added for the 2004 season.
Etymology:"Mine Train Ulven" is Dansk for "Wolfs Mine Train".
Notes:The lead car has only one row, so the train's capacity is 26, not 28 as listed above.

Geographic Options

Aerial Imagery

  • Date
  • Views
  • Rating

by
views
Preferences
Language:
Measure:
Date format:
Econo Mode: