Tracks

Height60.7 ft
Speed40.4 mph
Inversions0
Duration1:10
ElementsTunnel

Trains

Arrangement:7 cars per train. Riders are arranged 2 across in 2 rows for a total of 28 riders per train.

Details

Designer:Ing.-Büro Stengel GmbH
Subcontractor:Giovanola

Facts

A tunnel on the first drop was added for the 2004 season.

Etymology

"Mine Train Ulven" is Dansk for "Wolfs Mine Train".

Notes

The lead car has only one row, so the train's capacity is 26, not 28 as listed above.

Geographic Options

Aerial Imagery

  • Date
  • Views
  • Rating

by
views
Preferences
Language:
Measure:
Date format:
Econo Mode: