Tracks

Inversions4
ElementsChain Lift Hill
Loop
Loop
Double Corkscrew

Trains

Arrangement6 cars per train. Riders are arranged 2 across in 2 rows for a total of 24 riders per train.

Notes

Based on a picture of one vertical loop under construction, this appears to be Hebei Zhongye 4 Ring Coaster as the box beam track seems it will be continuous to join a second vertical loop -- a feature only seen on a 4 Ring Coaster.

Maps

Aerial Imagery

Videos

Sort By:

Sign On

Options