Removed, Operated from to
Make: Mountain Systems GmbH
| Length | 3116.8 ft |
|---|---|
| Speed | 24.9 mph |
| Inversions | 0 |
| Elements | Cable Lift Hill |
| Arrangement | 15 cars. Riders are arranged inline in 2 rows for a total of 2 riders per car. |
|---|
| Former status | SBNO from to Operated from to |
|---|---|
| Steel Fabricator |
| Being relocated to the Ukraine as of early June 2020. |