Tracks

Inversions0
ElementsChain Lift Hill

Trains

Arrangement:Single car trains. Riders are arranged inline in 2 rows for a total of 2 riders per car.

Details

RelocationsWashington State Fair as Monster Mouse
Parque Acuatico Rey Park as Monster Mouse

Operating schedule

This Monster Mouse may not be operating. In late 2018, a local tour guide stated the park was still trying to get permission to operate the ride.

Geographic Options

Aerial Imagery

  • Date
  • Views
  • Rating

by
views
Preferences
Language:
Measure:
Econo Mode: