Tracks

Inversions0
ElementsCable Lift Hill

Trains

ArrangementSingle car trains. Riders are arranged inline in 2 rows for a total of 2 riders per car.

Etymology

"Trilha do Ouro" is Portuguese for "Gold Trail"

Operating schedule

The Trilha do Ouro was being operated as a transport to the waterfall and riders were only permitted on the uphill section.  The park stated this was a temporary situation.  YouTube videos do show the full ride in use the prior year.

Maps

Aerial Imagery

Videos

Sort By:

Sign On

Options