Tracks

Length3,510.5 ft
Height118.1 ft
Speed55.9 mph
Inversions0
Vertical Angle70°
Duration2:08
ElementsChain Lift Hill
Tunnel
Tunnel

Trains

Arrangement:2 trains with 5 cars per train. Riders are arranged 2 across in 3 rows for a total of 30 riders per train.

Details

Capacity:1,149 riders per hour
Builder:Ingenieur-Holzbau Cordes
Designer:Ing.-Büro Stengel GmbH

Facts

During the 2003-2004 off-season noise screens were added to the Balder.

Theme

Themed around the Scandinavian god of Justice. Balder is the son of the gods Frigg and Odin. He could only be killed by a mistletoe arrow shot by his brother, the blind archer Hoder.

Cost

Cost 100 million SEK (about 9-10 million USD).

Geographic Options

Aerial Imagery

  • Date
  • Views
  • Rating

by
views
Preferences
Language:
Measure:
Date format:
Econo Mode: