Statistics

Length:5,500 ft
Height:186 ft
Inversions:4
Speed:50 mph
Duration:3:30
Elements:Loop
Loop
Helix
Tunnel
Tunnel
Bowtie

Details

Trains:3 trains with 7 cars per train. Riders are arranged 2 across in 2 rows for a total of 28 riders per train.
Theme:Concept artwork for the Dragon Mountain had a volcano facade around the helix. The structure was built, but the facade itself wasn't put on until the 2006 season.

Geographic Options

Aerial Imagery

  • Date
  • Views
  • Rating

by
views
Preferences
Language:
Measure:
Date format:
Econo Mode: