Tracks

Inversions2
ElementsChain Lift Hill
Loop
Barrel Roll
450° Helix

Trains

ArrangementSingle car trains. Riders are arranged 2 across in a single row for a total of 2 riders per car.

Operating schedule

The Roller Coaster was not operating and the cars appeared to be disassembled. It is unknown how long it had been in this state, but it was known to be operating in November 2034.

Maps

Aerial Imagery

Videos

Sort By:

Sign On

Options